ALE completed the transportation of two CO2 vessels to the UKs biggest sugar supplier.
Using a 4 spacer, 4 transport configuration, the vessels were transported from the port of King’s Lynn to the Wissington factory site, where they were then transhipped onto a four-row SPT, transported through the tight onsite road system and off-loaded to foundation. ALE also completed a route survey, swept path drawings and street furniture removal.