[Skip to content]

Monday 21 May 2012
.

Transportation and installation of gas turbines, steam turbine and steam generators, Abu Dhabi UAE

 

ALE were contracted to transport and install 4 sets of gas turbines, 2 sets of steam turbines and steam generators In Abu Dhabi. 

All items were received onto SPMTs from the vessel in Mina Zayed Abu Dhabi, loaded onto ALE 250 barge and transported to Shuweihat S1 jetty where they were rolled off and stored at the quay.  

ALE used SPMT's to transport the 306te turbines and 318te generators from the jetty to site where they were installed to their 5m high foundations by use of ALE's hydraulic gantry system.

[ Zoom ]
Gas Turbine
[ Zoom ]
Gas Turbine 2