[Skip to content]

Monday 21 May 2012
.

TPDP-A topside, Vietnam

ALE performs ballasting and load-out for TPDP-A topside project in Vietnam.

The 1,488te Topaz-A topside was moved from PTSC fabrication yard to the quayside using SPMTs and then loaded-out onto the barge, which was moored against the jetty.

[ Zoom ]
Vietnam2
[ Zoom ]
Vietnam