DGCP Topside

Site move and load out of DGCP, Vietnam

ALE performed a 952te DGCP topside site move and load-out. The move took place from Vietsovpetro Port fabrication yard to a barge in Vung Tau, Vietnam. 

The load out was successfully completed using SPT trailers, winches and ballast pumps.