Ship Lengthening

Ship lengthening, Singapore

ALE were contracted to provide skidding for the Aratere vessel in Singapore while a new 1,500te mid-section was installed.

ALE installed a skid track in the floating KFD dock of Sembawang Shipyard in Singapore. The middle skid  system consisted of a 175m skid track, 11 skid beams, 33 load spreading beams and four push-pull units (capacity 83te). The side stability tracks used consisted of three skid shoes on each side, each with a capacity of 500te.

The skid shoes took the weight of the vessel whilst the client completed the cutting element of the project. ALE then skidded the fore ship forward over a length of 35m. The old bow, which weighed 115te, was also skidded out and the new 29.25m mid-section, weighing 1,500te was skidded 5m into place using weight 500te capacity skid shoes. After aligning the mid-body ALE repeated the procedure with the fore ship and new bow section.