ALE was contracted to jack up and load-out a 5,995te offshore rig. The 97 metre long x 63 metre wide x 40 metre high rig was transported using 216 axles of SPMT. With the weight of the trailers and the auxiliary steelwork, the total load reached 6,931te.
The rig was loaded out on to the Hamiryah Pride barge for float off. ALE provided all necessary engineering works from load-out to float off.