ALE performed the load-out of two modules - one weighing 1,205te and one weighing 987te - at Laem Chabang port in Thailand.
The modules were transported a distance of 500 metres using 78 axle lines of SPMTs. ALE was also responsible for other aspects of the project, including all of the engineering calculations, mooring and ballasting.