ALE began the project by jacking three modules weighing 80te each on the live gas plant. The modules were then transported through site to the heavylift quay. Using SPMTs the modules were loaded-out to a ferry bound for Stord where ALE received them and transported them to the decommissioning area.
ALE transported the replacement 240te modules from the heavylift quay at Kollsnes through the site using SPMTs and jacked each module down to the permanent foundations. ALE also provided site transport and jacking operations for a 170te receiver module and the load-out and load-in of a hot oil drum tower weighing 200te, a pipe rack weighing 20te and a hot oil heater module weighing 185te.