Dai Hung topside

Dai Hung two topside, Vietnam

ALE was contracted to complete the site move and load-out of the Dai Hung two topside at the Vietsovpetro port in Vung Tau City, Vietnam.

The 1,400te topside was transported on site from the fabrication yard to the barge in preparation for load-out using 48 axles of SPMTs. Beams, mooring winches and ballast pumps were used in the load-out phase of the move.