ALE were contracted to complete a site move and load-out of Dai Hung 2 topside at the Vietsovpetro port in Vung Tau City in Vietnam.
The load weighing 1400te was transported on site from the fabrication yard to the barge in preparation for load-out using 48 axles of SPMT’s. Beams, mooring winches and ballast pumps were used in the load-out phase of the project.