[
Skip to content
]
Text only
Accessibility
Site map
widescreen
Text Size:
larger
/
normal
/
smaller
Thursday 29 July 2010
Online Media Centre
Employee Area
Search our Site
Search
Home
Company
HSQE
Sectors
Services
News
Case studies
Resources
Human resources
Contact us
You are here
»
Home
|
Case Studies
Case Studies
PfcE, Malaysia
Lifting a 1,457te reactor, Portugal
Unloading and transporting a reactor, Portugal
Berkenthin Bridge, Germany
House Move, Mexico
Launching of Spellener bridge, Germany
Transportation of two container cranes, Belgium
Peregrino project, Indonesia
Mackenstreet Bridge, The Netherlands
Jacket load-outs, Vietnam
Ship Loader, Qatar
Kumang and Tangga Barat Development project, Malaysia
Transportation of Hex Boxes, Abu Dhabi
Stator Generator Transport, South Africa
Chim Sao project, Vietnam
Laem Chabang Port, Thailand
Fractionator and Stripper transportation, Portugal
DOW Mega project, Thailand
Sharjah, UAE
Den Bosch, The Netherlands
Locking gate installation, Belgium
Mexilhao Project, Brazil
Pearl Gas-to-Liquid project, Qatar
Launching of Colastine River, Argentina
Alcan G3 Expansion Project
Alcántara Dam, Spain
BOS Shelf, Azerbaijan
Buzzard Field Development Project, UK
Enchantment of the Seas, The Netherlands
Escravos Gas-to-Liquid Project, Nigeria
Estrecho de Paredes viaduct, Spain
Greater Gabbard, UK
Jack-up and installation of a bridge, Germany
Container Cranes, UAE
Offshore Sakhalin Island, Russia
Olefins Plant, Saudi Arabia
Quinshan N.P.P, China
Salalah Methanol Plant, Oman
Staythorpe Power Station, UK
Super M2 Rig Hull, UAE
Topside load-out, Koje, Korea
Transportation and barging of evaporators, UAE
Transportation of hydro turbine runner, Canada to Sweden
Turnkey operations in Tampico, Mexico
Uprighting of columns
.
Case Studies
A selection of our most recent case studies are outlined below.
PfcE, Malaysia
ALE have completed the first phase of the PfcE project, which included a 5,800te jacket load-out.
Lifting a 1,457te reactor, Portugal
ALE has successfully completed the lift of a 1,457.1te reactor in Sines, Portugal. The inaugural lift of ALE’s new Terex Demag CC8800-1 crane, is the heaviest piece lifted with this type of crane and...
Unloading and transporting a reactor, Portugal
ALE have unloaded and transported, what is believed to be the largest cargo to date, in Portugal. The reactor weighed 1,457te and was 42m long, 7.2m high and had a maximum width of 7.9m.
Berkenthin Bridge, Germany
ALE installed a 64metre long road bridge utilising strand jacks, SPMTs, skidding plates, climbing jacks, a barge and a 250te mobile crane.
House Move, Mexico
ALE were responsible for skidding a historic building, protected by the Fine Arts of Mexico, in order to free space to build a car park. Once the car park was completed, the 2,500te house was then...
Launching of Spellener bridge, Germany
ALE installed a 70 metre long road bridge in Wesel, Germany using strand jacks, SPMTs, skidding plates, climbing jacks and a barge.
Transportation of two container cranes, Belgium
ALE has completed the transportation of two container cranes at quay 730 in Antwerp, Belgium.
Peregrino project, Indonesia
ALE have recently completed a 5 month contract to weigh and load-out 10 modules from Batam Island, Indonesia for the Peregrino FPSO project.
Mackenstreet Bridge, The Netherlands
ALE successfully completed the load-out of the Mackenstreet Bridge using two 28-line, two 18-line and two 10-line SPMTs.
Jacket load-outs, Vietnam
ALE has completed the load-outs of 5 jackets in Vietnam.
Page:
[
1
]
[
2
]
[
3
]
[
4
]
[
5
]
[
Next
»
]